Filter & Sort
99 Results
Search Our Technical Library
Showing search results
99 Documents
Document 13
Contractor Checklist for EXACOR Wall Sheathing
This checklist outlines the important observations and practices to perform successfully when installing EXACOR underlayment.
Document 14
EXACOR Testing in Fire Rated Assemblies
This technical tip will explore the allowable test methods used to determine fire-resistance rated assemblies, the International Building Code (IBC) requirements regarding fire rated assemblies, the type of agencies allowed to perform fire rated...
Document 15
Townhome Separation Walls with EXACOR Sheathing
This technical tip explains how EXACOR wall sheathing can be used to meet fire-resistance requirements in townhomes.
Document 16
EXACOR™ Wall Sheathing Commercial Limited Warranty
This document explains the product warranty for EXACOR wall sheathing products used in commercial applications.
Document 17
Huber Blue™ Limited Warranty
This document explains the product warranty for Huber Blue products used in residential applications.
Document 18
EXACOR Residential Limited Warranty
This document explains the product warranty for EXACOR products used in residential applications.
Document 19
Installation Manual | EXACOR Wall Sheathing
This Installation Manual covers basic installation recommendations for EXACOR wall sheathing.
Document 20
3-Part Spec – EXACOR Sheathing - Section 061600
This 3-part specification uses CSI Masterformat™ for architectural specs in regards to the applications of EXACOR sheathing.
Document 21
Code Recognition for EXACOR wall sheathing and underlayment | ESR-4635
ESR-4635 provides information on structural performance, durability, and surface burning characteristics for EXACOR wall sheathing and underlayment.
Document 23
Window and Door Sealant Compatibility with ZIP System Products
This technical tip covers compatibility of a wide range of window and door sealants applied over ZIP System sheathing and accessory products
Document 24
Brick Ledge With Insulated Slab Using ZIP System R-sheathing
This detail shows HEW's recommendation on how to address a transition from ZIP System R-sheathing to an insulated slab foundation with brick ledge