Filter & Sort
171 Results
Search Our Technical Library
Showing search results
171 Documents
Document 01
When Is High Temperature ZIP System PSU Necessary
This document explains when to use High Temperature ZIP System peel and stick underlayment in roof assemblies.
Document 02
3-Part Spec - ZIP System Roof Sheathing- Section 061600
This 3-part specification includes a short form format for architectural specs in regards to the sheathing applications of ZIP System sheathing.
Document 03
Top of Wall Details with ZIP System Rainscreen and ZIP System Sheathing
This detail shows HEW's recommendations when addressing the top of the wall when stucco is installed over ZIP System rainscreen and ZIP System sheathing.
Document 04
Bottom of Wall Details with ZIP System Rainscreen and ZIP System Sheathing
This detail shows HEW's recommendations when addressing the bottom of the wall when stucco is installed over ZIP System rainscreen and ZIP System sheathing.
Document 05
Manual de Instalación | ZIP System Peel and Stick Underlayment
Este manual de instalación cubre las recomendaciones básicas de instalación para ZIP System Peel and Stick Underlayment cuando se usa en aplicaciones de techo.
Document 06
ZIP System™ Peel and Stick Underlayment Limited Warranty
This document explains the product warranty for ZIP System peel and stick underlayment used in residential and commercial applications.
Document 07
ZIP System Peel and Stick Underlayment Leak-Free Warranty
This document explains the leak-free warranty for ZIP System Peel and Stick Underlayment used in residential applications.
Document 08
Drainage Efficiency of EIFS Cladding Wall Assemblies | ZIP System Wall Sheathing | UEL-5010
Evaluation Service Listing for ZIP System Sheathing wall as it relates to the panel's drainage efficiency.
Document 09
Shear Capacity and Wood Structural Panels
This Technical Tip will discuss shear capacities for wood structural panels, when blocking is required and panel orientation.
Document 10
Window Sill Flashing Depth with ZIP System Stretch Tape
This detail shows HEW's recommendations on the depth-of-flashing requirement for window sill flashing.
Document 11
Common Causes of Roof Leaks During Construction
This technical tip covers the common areas on an unfinished roof deck that may allow water into the building before the structure is dried-in.
Document 12
Submittal Form for ZIP System Peel and Stick Underlayment
This submittal form is a fillable PDF for the submittal of ZIP System peel and stick underlayment, along with the associated product data sheet.